SS - Risk Assessment

Hazard
Involved
Likelihood
Severity
Control Measure
Fire
Cast (12) and audience (approximately 15)
Unlikely
Severe
No naked flames
Trips/ Falls in the tunnels
Cast (12) and Audience (approximately 15)
Even
Mild
Cast well-rehearsed in the tunnels
Path clear and well lit
Hazards clearly marked
Items falling from height
Cast (12) and Audience (approximately 15)
Possible
Medium
No item left/used at height
Getting lost
Cast (12) and Audience (approximately 15)
Possible
Mild
Cast members are to be familiar with the tunnels
Audience will not be left alone throughout performance
Broken Equipment
Cast (12)
Possible
Mild-Medium
All equipment and props will be checked for damage/faults before the performance
Gate Jamming
Cast (4) and Audience (approximately 15)
Unlikely
Mild
Gate will be well checked and rehearsed with